如果要原文+偏理論的計算數值
這邊有
'' The consumption of electric energy is 11-13 kWh/kg produced MG-Si. ''
引用自
http://www.suite101.com/content/sil...ication-a232890
或者
Energy requirements for each step are assumed to be as follows:
Production of MG-Si: 20 kWh per kg of MG-Si produced (15 kWh of electricity is required; the carbon sources are equivalent to a further 5 kWh of electricity) [2,3]
Production of EG-Si: 100 kWh per kg of EG-Si produced [2,3].
Production of Czochralski silicon: 210 kWh/kg of EG-Si loaded into the crystal grower [2,3].
Cell fabrication: 120 kWh/m2 of silicon [2,3].
Panel assembly: 190 kWh/m2 of panel [2,3].
Support structure and other BOS costs (open field): 700 kWh/m2 of panel (open field) or 200 kWh.m2 of panel (rooftop) [1-4].
引用自
http://webcache.googleusercontent.c...w.google.com.tw